VERDICT RATING / INSTITUTIONAL ROADMAP

Can the asset
deliver the investment case?

The proposed infrastructure rating connects power, water, land use, and permitting evidence to project economics and delivery risk.

INSTITUTIONAL OFFERING

The mandate and its evidence.

Institutional service roadmap

The capabilities below describe the planned institutional offering. The live product is a working site and investment application with manual source review, provisional screening rules, and IC working drafts. Engagement availability and scope must be confirmed with the founding team.

A permitted site is not the same as deliverable capacity.

Verdict Rating is designed to examine the conditions that determine whether infrastructure can be developed and operated as underwritten. The plan covers development and operating assets with approved evidence standards and professional sign-off.

The working site and investment platform offers a provisional screening workflow. It does not issue a signed institutional rating.

PROPOSED RATING PILLARS

Deliverability has
physical dependencies.

Power & interconnection

Utility commitments, queue position, capacity, tariffs, and energization milestones.

Water & thermal

Water availability, cooling requirements, and thermal constraints.

Community & land use

Land use, permits, hearings, ordinances, and community context.

FINANCIAL CONSEQUENCES

A constraint must connect
to the economics.

Capacity, timing, and commitments affect yield, debt-service capacity, and the downside.

The planned asset engine links physical evidence to IRR and DSCR, so an interconnection delay or conditional allocation can be assessed within the financial case.

Scenario analysis, automated source extraction, and institutional consequence mapping require further implementation.

RATING AND SCREENING

Two methods.
A reconciliation to complete.

Live MVP / Ruleset 0.1

Data-center screening

Six categories. Readiness and source-coverage confidence. V1–V4 screening outcomes. Manual source review and an IC working draft.

How we assess evidence →
Proposed institutional method

Infrastructure rating

Three physical pillars and proposed confidence grades A–D. Rating outcomes summarize asset quality and unresolved conditions.

The models are distinct. A methodology lead must reconcile and validate them before institutional use.

PROPOSED OUTPUT

The rating.
The conditions.
The domain view.

  • An infrastructure rating with supporting evidence and approved reliance terms.
  • A condition matrix identifying unresolved deliverability requirements.
  • An IC view connecting physical constraints to the economics.
  • A monitoring scope for changes after commitment.

EXPLORE THE SUITE

The next stage
draws on the same evidence.

Screening scopes diligence. Diligence supports the committee. Monitoring follows the investment.

All nine Verdict products →

THE NEXT DECISION

Put the evidence on the table.

Explore the working site and investment platform or speak with the co-founders about financial diligence, infrastructure, credit, and portfolio intelligence.