LIVE DEMONSTRATION / RULESET 0.1

Inspect the workflow.
Follow the evidence.

The first working product is a data-center diligence MVP. Project Atlas demonstrates the current workflow with entirely synthetic data and documents.

PROJECT ATLAS

A promising site.
A conditional decision.

CURRENT SCREENINGV2

Proceed with conditions

120 MW planned. 90 MW conditionally allocated. Remaining capacity requires an executed utility agreement.

77/100

Investment readiness

69%

Evidence confidence

  • Secure the remaining power.
  • Convert tenant LOIs into executed leases.
  • Validate delivery commitments and the critical path.

Synthetic example under provisional Ruleset 0.1.

Actual Verdict workspace showing synthetic Project Atlas, V2 screening, readiness 77, confidence 69 percent, six diligence categories, and unresolved conditions.
Actual Verdict product · Project Atlas is a synthetic demonstration · Select image to inspect

SIX CAPABILITIES

From intake
to committee preparation.

01

Site Intelligence

Bring capacity, power commitments, site approvals, technical design, and commercial assumptions into one project view.

02

Due Diligence

Examine six interconnected categories, from utility commitment to delivery readiness. Make missing inputs visible.

03

Risk Assessment

Surface weak categories, analyst-recorded contradictions, hard stops, and conditions that need resolution.

04

Scoring

Separate investment readiness from evidence confidence. Inspect deterministic rules and category weights.

05

Evidence

Record the claim, source reference, date, category, and review status. Follow the source record into the assessment.

06

Decision Intelligence

Turn the current assessment into an investment committee working draft, with risks, conditions, and supporting evidence.

THE CURRENT WORKFLOW

The analyst records.
The code calculates.

01 / INTAKE

Enter the assumptions

Create a project and record power, site, design, commercial, financial, and execution inputs.

02 / SOURCES

Review the evidence manually

Upload a document, enter its claim and reference, and assign review status. Uploading does not extract claims or verify the document.

03 / ASSESSMENT

Inspect the screening basis

Review category scores, weighted readiness, source-coverage confidence, contradictions, hard stops, and conditions.

04 / OUTPUT

Generate the IC working draft

Export a memorandum with the snapshot, assessment, risks, conditions, missing evidence, and source register.

CURRENT SCOPE

Working today.
Next development.

01

Available now

Guest browser workspace, private authenticated projects, document storage, manual source review, category drill-down, and IC draft export.

02

Planned expansion

Automated extraction, specialist agents, team collaboration, formal review history, surveillance, and the broader institutional suite.

03

Review required

Ruleset 0.1 is provisional. The demonstration is not a signed rating, independent attestation, or investment approval.

THE NEXT DECISION

Put the evidence on the table.

Explore the live data-center demonstration or speak with the co-founders about financial diligence, infrastructure, credit, and portfolio intelligence.